How i-Reporter was used to reduce the time required to analyze work by client and product from 15 days to 2-3 minutes
A case study of linking with external systems to improve quality and reliability
A case study of increased operational efficiency and cost reduction at a vast shipbuilding factory
Example of computerization of inspection records at the time of shipment
Example of efficient production line records
Kyushu Yanagawa Seiki Co., Ltd.
A case study of realizing company-wide quality improvement through instant photo management of change management boards
A case study where purchasing supplies were digitized, leading to a reduction in the number of man-hours required for calculations and a change in cost awareness
A case where 190 lines of daily reports were converted to real-time and management burden was significantly reduced
A case study of real-time management of a 200-meter painting line and accelerating the improvement cycle
Tianjin Denso Electronics Co., Ltd. (TDE)
Achieve paperless forms and utilize records in one go.Establishing an in-house design team to improve on-site efficiency and motivation
PAL Inc.
The work efficiency is superior to that of inspection using a handheld scanner. Oversights have been drastically reduced to almost zero, and customer trust has increased.
Showa Create Cebu, Inc.
Digitization of the vast amount of paper forms that are essential for quality control of metal press parts. Hoping for horizontal deployment to the Japanese headquarters.
Mocras Co., Ltd.
Namura Shipbuilding Co., Ltd.
Toyota Motor East Japan, Inc.