How i-Reporter was used to reduce the time required to analyze work by client and product from 15 days to 2-3 minutes
A case study of linking with external systems to improve quality and reliability
A case study of increased operational efficiency and cost reduction at a vast shipbuilding factory
Example of computerization of inspection records at the time of shipment
Example of efficient production line records
九州柳河精機株式会社
変化点管理板の写真管理を即時化し、全社横断の品質改善を実現した事例
購買備品払い出しをデジタル化し、集計工数削減とコスト意識改革につなげた事例
190ラインの日報をリアルタイム化し、管理負担を大幅に削減した事例
200メートルの塗装ラインをリアルタイム管理し、改善サイクルを加速させた事例
Tianjin Denso Electronics Co., Ltd. (TDE)
Achieve paperless forms and utilize records in one go.Establishing an in-house design team to improve on-site efficiency and motivation
PAL Inc.
The work efficiency is superior to that of inspection using a handheld scanner. Oversights have been drastically reduced to almost zero, and customer trust has increased.
Showa Create Cebu, Inc.
Digitization of the vast amount of paper forms that are essential for quality control of metal press parts. Hoping for horizontal deployment to the Japanese headquarters.
Mocras Co., Ltd.
Namura Shipbuilding Co., Ltd.
Toyota Motor East Japan, Inc.